Industrial thermal insulation

Thanks to the experience gained in this activity, the company is able to guarantee a high level of technical qualification, in the work execution of the various insulation types. In addition to maintenance work in some thermoelectric power plants, the company has consolidated an efficient organization through the execution of top-quality jobs. For the construction of the Montalto di Castro Enel Power Plant have been executed the boilers insulation, pipes, electrofilters, steam turbines and gas turbines; during the combined cycle conversion of the Torrevaldaliga Power Plant of TIrreno Power, have been executed work of insulation removal (including asbestos) and insulation installation; and it has participated with insulation contracts for the coal processing operations of the Torrevaldaliga Nord Power Plant of Civitavecchia.

M.C.P. is also equipped with a centralized workshop equipped with modern numerically controlled machines.

Asbestos removal

For the reclamation of industrial plants and asbestos-containing products, M.C.P. has performed important work. The insulation removal involved steam generators and thermal cycles of 320 MW units and roof of industrial and civil building.

The company has its own qualified employees, who attended regional courses for the reclamation of components containing asbestos and is registered in the National Waste Management Register.

 

Scaffoldings

Complementary activity to the thermal insulation work (also required for other types of building work, industrial coatings) the installation of scaffolds with tubes, prefabricated frames and multidirectional coupling system type SM8 of Dalmine, carried out according to the regulations in force, utilizing for the realization of this activity of highly specialized workers and technicians.

The realization of scaffolding is also carried out for third parties both in the industrial and civil sectors.